Home News

company news about Installation method of SH0308B air release value tester

Certification
China Shandong Shengtai instrument co.,ltd certification
I'm Online Chat Now
Company News
Installation method of SH0308B air release value tester
Latest company news about Installation method of SH0308B air release value tester

Installation method of SH0308B air release value tester

 

1. After the instrument is unpacked, carefully remove the packaging, check whether the accessories are complete and damaged against the packing list of the instrument accessories.
If the accessories are incomplete or damaged, please contact our company in time.
2. Put the jacket glass test tube on the test rack.
3. Connect the water inlet of the jacketed glass test tube with the water outlet of the host, and connect the water outlet of the jacketed glass test tube with the water inlet of the host, as shown in Figure 2:

latest company news about Installation method of SH0308B air release value tester  0

4. Connect the air outlet of the air compressor with the vent port behind the main engine.
5. Connect the air compressor power plug.
6. Connect the mainframe power supply.
7. If no water is injected, the drainage pipe above the back can be connected to the sink to prevent overflow due to excessive water injection.

 

Pub Time : 2021-04-19 10:18:52 >> News list
Contact Details
Shandong Shengtai instrument co.,ltd

Contact Person: Miss.

Send your inquiry directly to us (0 / 3000)